Skip to content
Exolavario
Quality Engineering

Critical Path Test Engineering

Browser-level automated testing of your most important user flows, built into the delivery pipeline and stable enough that every result is taken seriously by your engineers.

Timeline
20 working days
Deliverables
7 listed
Reference
EX-QLE-101
Fixed fee
₹37,999

01 / Overview

What this service delivers

An unreliable test suite does more harm than having none, because engineers soon start ignoring failed builds. Our browser automation is designed for stability from the first line: no fixed sleeps, element selection through dedicated test attributes instead of styling hooks, and fresh data seeded and removed on every execution. Around 40 scenarios span your business-critical flows and run on each of the three major browser engines. Whenever a scenario fails, it leaves a trace, a video recording and a screenshot, so your team can see exactly what went wrong without rerunning anything by hand.

02 / Deliverables

What you receive 7 items

  1. 01Around 40 automated browser scenarios spanning your business-critical flows
  2. 02Execution on all three major browser engines
  3. 03Page object design, so a single interface change does not cascade into mass failures
  4. 04Independent test data, seeded and removed per test with no shared state
  5. 05Pipeline integration with parallel execution completing within 15 minutes
  6. 06Trace, video recording and screenshot retained for every failure
  7. 07A written guide showing your engineers how to add new tests

03 / Fit

Who it suits, and what we need from you

Ideal for

  • Teams held up by a manual regression checklist before each release
  • Products where a failed checkout could go unseen for hours
  • Organisations shipping more often while feeling less sure of every release

What we need from you

  • A reliable staging environment populated with realistic data
  • Approval to add dedicated test attributes to your interface markup
  • An engineer or tester who can confirm the expected behaviour of each flow

You share these through the technical brief in your dashboard after checkout.

04 / Outcomes

What changes for your team

  • 01

    Regressions are stopped in the pipeline before customers ever meet them

  • 02

    Manual regression shrinks from several days to a short exploratory session

  • 03

    Each failure comes with evidence attached, so diagnosis takes minutes

This is a remote engineering service, so nothing is shipped physically. Work is delivered into systems you control. Read delivery & handover and refunds & cancellation for the full terms.

Related services

Often considered alongside this one.

All Quality Engineering
01 Quality Engineering

Handset Compatibility Assurance

Manual testing of your mobile app on the phones your customers actually use, rather than only on the latest premium model sitting on a desk.

8 working days ₹18,999
02 Quality Engineering

API Contract Assurance

Contract testing that fails the build as soon as an endpoint alters its response structure, so server releases no longer break the apps and partners depending on them.

9 working days ₹20,999
03 Quality Engineering

Risk-Led Quality Strategy

A documented regression testing plan prioritised by product risk, showing which areas deserve automation earliest and which are better handled through manual testing.

7 working days ₹13,999
04 Quality Engineering

Load Resilience Engineering

Load testing that finds exactly where your system breaks under traffic, identifies which component fails first and puts hard numbers against each finding.

12 working days ₹26,999
Start a build

Have a system in mind? Let’s engineer it properly.

Choose a published service, or describe the problem and we will point you to the right starting place.